February 27, 2007: Final cleanup and drilling
Here is the worksite - The Grace pier, Carlos and Michael doeing something
while Ben (who still looks like his brother Stan) and Robbie are drilling and
Sparky capturing the action

A wave from Carlos

Ben and Robbie removing a drilling shaft

Out it comes

Watch Ben and Robbie remove the
drill shaft.
Removing the drill shaft

Ben drilling a new hole

The base of T-2 - for Wednesday's loading and implosion

and cleanup around the base of T-2 - scooping

up a shovel full of stuff

and dumping it along a wall to the north of T-2

and out it comes

Then smoothing the surface

More scooping

rotating

and dumping

Anohter scoop

and dump

and the worksite as Sparky goes to his real work