February 27, 2007: Final cleanup and drilling
Here is the worksite - The Grace pier, Carlos and Michael doeing something
while Ben (who still looks like his brother Stan) and Robbie are drilling and
Sparky capturing the action
A wave from Carlos
Ben and Robbie removing a drilling shaft
Out it comes
Watch Ben and Robbie remove the
drill shaft.
Removing the drill shaft
Ben drilling a new hole
The base of T-2 - for Wednesday's loading and implosion
and cleanup around the base of T-2 - scooping
up a shovel full of stuff
and dumping it along a wall to the north of T-2
and out it comes
Then smoothing the surface
More scooping
rotating
and dumping
Anohter scoop
and dump
and the worksite as Sparky goes to his real work