January 27, 2006:
Unbuilding acrobats
Today, Sparky captured the removal of the to half of the A
First - wrap the cables from the crane
then attach to the shackel
Get into position - one burner on each side of the A
and start cutting
Here comes the other team (right)
and start cutting on the right side of the A
a closer view
A duet of burners
then cutting through the edge (left)
and edge (right)
with an acrobatic twist
Then start cutting the top girder (left)
and top girder (right)
another duet for 2 burners and torches
The sections separates
gently lifted
and lowered to the barge