June 19, 2006:
Mickey disappears another substructure
From halfway around the world, I'm disoriented. This is the current
active worksite with C-3 on the left and Michael's high-boy
1250 whacking away at P-9

And for orientation, our reference photo with pier labels

Timmy with his low-boy whacking away at P-10

The P-7 blast site - shock tubes in place and ready to blow

Mickey's John Henry ready to work on the Grace pier that was repaired
in the late 50s - P-6. The John Henry will dive onto P-6 and drill
from on top of the pier cap.

Now its 3 pm (14:57:12 by Sparky's camera) and the before

Ignition sequence
T = 0 sec T = 0.033 sec

T = 0.067 sec T = 0.100 sec

T = 0.133 sec T = 0.167 sec

T = 0.200 sec T = 0.233 sec

T = 0.267 sec T = 0.300 sec

T = 0.333 sec T = 0.367 sec

T = 0.400 sec T = 0.433 sec

T = 0.467 sec

14:57:13

14:57:14

14:57:15

14:57:16

14:57:17

14:57:18

14:57:19

14:57:20

14:57:21

14:57:25

Now to get back to work, Pat on the left with the Capt. Gary is positioning
the barge near C-3

and the John Henry is getting set up to drive onto the P-6 cap
for some serious drilling of the platform. It will be interesing to
see what happens to the pylon supports under the concrete cap.

from a different perspective

This looks like the Grace P-8 and partial P-9 on the left and the Pearman
C-1 footing in the foreground with C-2 and C-3 in the background.

A last view of the worksite (P-8 and P-9 with Michael's high reach arm
hammering away)
