Mar 26, 2007: Drilling and teardown
The worksite: The Grace pier foundation, Manny's crane and Mickey's Copco -
ready to finish
A closer view. The little red inverted cups protect the holes from
rain water and debris associated with drilling other holes
Manny in the driving position - with his other cap
Preparing to lift the Copco, rotate it 180 degrees and start drilling the
other end
Getting ready to lift
Lifting
Setting up the drilling tower
Almost in position
Reading for drilling. Click to watch the
rotate and position (3.7 MB mpg)
and drilling away.
Finished
Then Manny does it again - moving the Copco from the Grace foundation
to Sparky
Rotating
and down. Now click to watch
watch Manny lift the Copco and move Sparky
and a last look at the worksite