November 4, 2005:
Pearman Progress: Picking girders
Starting at the beginning - here is the Ravenel Bridge, the Pearman
skeleton - and off to the lower right you can see the red crane towers -
the site of girder picking.

Here is the setup at the edge of Drum Island - The left crane does the
lifting and placement of each
girder spanning two pier caps while the right crane is sort of like a
surgical assistant - helping with the fetching and toting.
For the last girder, the right 2250 held it in place after the 4th girder
had been taken down. This stabilized the 5th (edge) girder and prevented
it from falling over.

Here you can see the exposed girders with internal X crossmembers.

I managed to get to the site just as they in the final stage of lowering
this edge girder

Here you can see a white edge girder attached to the left crane with
transverse supports (half X's) on the right side of the girder

Here you can see the burners at each end of the girder
removing the skeletons of the cross members

A closer view of the cross-member xkeletons and burning through one of them

At the other end of the girder, removing the lower part of the X

A few minutes later, I got lucky and caught the final cutting of the upper
member -

and here is the last cut as it dropped to the barge floor

Next some cutting from the top