Changing the face of Charleston : The unbuilding of the Grace and Pearman Bridges
Frank's Internet Home Page
Blog: 2005
Archives of unbuilding sections
Blog: 2006
The story of building the Ravenel Bridge
Visit our
Adventures in Singapore
Click to view all web page segments
I enjoy hearing from you. If you have comments and suggestions, write me.


Unbuilding Highlights
(Apr 10)
Meeting St. Stories
(Jul 10 2006)
East Bay Stories
(Oct 10 2006)
Drum Island Stories
(Feb 17)
Pearman Bridge Stories
(Apr 3)
Grace Bridge Stories
(Apr 3)
Imposions: Prep and boom
(Mar 27)
Unbuilding Bridge Blog
(July 23 2006)
Unbuilding Challenges
(Mar 13)
Learning Links
(Feb 20)
Unbuilding Stories
(Mar 13)
Video and Sounds
(Feb 28)

October 3, 2006: SCDOT Aerial Views of Unbuilding

Every 2 months, SCDOT acquires an aerial view of the unbuilding and provides us with a unique view from above. Sparky, Brian and Mickey provide us with ground level and water level photos. But the contribution from SCDOT (Julie and Creta and Larry Workman who flys and photographs ) provides a different perspective. Thanks!
Here is Cousin Arthur - mostly alone now. What a change over the past 10 months! Here is the view from

December 1 2005

dec 01 ravenel

and October 3, 2006

oct_03_15a_ravenel.jpg

Mission control is at the intersection of Huger St and East Bay and across the street you can see what is left of the PBC control center.

oct_03_scdot_3a.jpg

Here is the J. Cashman, the 995, doing cleanup. Note the two barges to the left - and the 995 snout fishing on the bottom right. Is that Pat and his tug keeping everything aligned?

oct_03_scdot_10a.jpg

A good look at the 995 dropping a load into the adjacent barge.

oct_03_scdot_27a.jpg

Another view of the 995 fishing and someone doing the fetching and toting of debris from one barge to the other barge

oct_03_scdot_30a.jpg

Here are the remaining Grace foot prints on the Mt. Pleasant side along with progress on the observation and fishing pier

oct_03_scdot_12a.jpg

A closer look at progress on building the observation pier

oct_03_scdot_14a.jpg

Back on the Charleston side - a view of the work on the remaining Pearman (foreground) and Grace (background) trusses.

oct_03_scdot_19a.jpg

From above the Sea Breeze Marina - and Mickey's new office

oct_03_scdot_23a.jpg

Here Michael is fishing for debris and Stan setting up for driving some piles at the far end of the observation pier.

oct_03_scdot_28a.jpg

Work around the Grace substructure

oct_03_scdot_32a.jpg

A better view

oct_03_scdot_34a.jpg

A view of the worksite on the north side of the Ravenel Bridge - with work on the Grace substructure in the foreground and in the background, the 995 cleanup. A very interesting shadow of the stay cables on the water surface

oct_03_scdot_35a.jpg

Click to view all unbuilding web page segments

Creative Commons License
This work is licensed under a Creative Commons License.

Attribution: C. Frank Starmer and Sparky Witte from http://oldcooperriverbridge.org